Renewable heating technologies require a dedicated hot water storage cylinder with a larger coil to allow maximum heat transfer of renewable energy into the stored water.
The
With a large proportion of the plumbing work already done at the manufacturing site, a pre-plumbed cylinder from Firebird can substantially cut onsite installation time by around 70%, reducing the amount of disruption to the customer. On installations using multiple cylinders, pre-plumbed cylinders help ensure consistency from one installation to the next.
In addition to significant reductions in installation times, pre-plumbed cylinders bring a consistency to each installation for a neater, more aesthetically appealing finish. They can also represent a substantial reduction in hassle and disruption to the homeowner or a house built as part of a planned build project.
With the most time-consuming aspects of the installation taken care of, all the plumber has to do is connect the Quick Plumb Unit, do a quick check of all the connections and it is ready for commissioning.